Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

TQM customer satifaction discussion, Papers of Total Quality Management (TQM)

this file was presentation of gathered date for milktea shop

Typology: Papers

2023/2024

Uploaded on 12/01/2024

glen-altas
glen-altas 🇵🇭

3 documents

1 / 18

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
ANG DE
Customer
Satisfaction Survey
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12

Partial preview of the text

Download TQM customer satifaction discussion and more Papers Total Quality Management (TQM) in PDF only on Docsity!

ANG DE

Customer

Satisfaction Survey

CONTENTS

Overview

Core Elements

Result

Conclusion and Recommendations

"Ang De Olongapo" is a popular milk tea shop in Olongapo City, offering a diverse menu of flavors and creative drinks. Known for budget milk tea, student friendly and focus on quality ingredients. It has become a favorite spot for locals.

Overview

CORE ELEMENTS

ANG DE Customer Satisfaction Survey Result

Variety of menu options:

CONCLUSION and RECOMMENDATIONS

Addressing the lack of tables and chairs is essential for improving customer satisfaction and operational efficiency. By assessing space utilization, investing in flexible furniture, and implementing effective management strategies, businesses can optimize seating arrangements. Additionally, fostering communication with customers and exploring temporary solutions can further enhance the experience. Overall, these measures will create a more welcoming environment that accommodates customer needs while

maximizing available resources.

Recommendations: Monitor performance: Regularly review staff interactions to identify patterns and provide constructive feedback on improving efficiency. Assess Space Utilization: Evaluate the current layout and identify areas where space can be optimized to accommodate more tables and chairs. CONCLUSION