



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Solar Panel Framework fora project proposal
Typology: Summaries
1 / 5
This page cannot be seen from the preview
Don't miss anything!
Project Logical Framework Project Results Indicator(s) Baseline Target (Mid- term) Target (Final) Means of Verification Source of Data Outcome 1: Improved energy efficiency and sustainability in the municipal building Percentage reduction in electricity costs High electricity costs from conventional energy sources 15% reduction in electricity costs 30% reduction in electricity costs Monthly electricity bills and financial records LGU Financial Office Output 1.1: Installation of a solar power system Number of solar panels installed No existing solar power system 50% of solar panels installed Full installation of solar power system Project completion report, site inspection Municipal Engineering Office Activity 1.1.1: Procurement and awarding of contract Contract awarded through BAC No contractor selected Contractor selected Installation contract signed BAC resolutions and contract documents Bids and Awards Committee (BAC) Activity 1.1.2: Installation and commissioning of solar panels Installed solar power system No existing solar system Partial installation completed Fully operational solar system Installation reports, technical assessment Municipal Engineering Office Output 1.2: Training Number of No trained At least 5 LGU At least 10 LGU Training reports, HR Office,
Project Results Indicator(s) Baseline term) Target (Final) Verification Data of LGU personnel on solar power system maintenance trained personnel personnel staff trained staff trained attendance sheets Engineering Office Activity 1.2.1: Conduct training workshops Number of workshops conducted No workshops conducted 1 training workshop conducted At least 2 training workshops Workshop schedules, training materials Training Department Activity 1.2.2: Develop maintenance manual Maintenance manual available No maintenance guidelines Draft manual developed Comprehensive maintenance manual developed Manual documentation Municipal Engineering Office Outcome 2: Increased energy security and resilience against power disruptions Reduction in power outages affecting LGU operations Frequent power interruptions 25% reduction in power interruptions 50% reduction in power interruptions Power outage logs Municipal Operations Office Output 2.1: Integration of battery storage Battery storage capacity installed No battery storage 50% of battery storage system installed Fully integrated battery backup system System test reports Engineering Office
Project Results Indicator(s) Baseline term) Target (Final) Verification Data Outcome 3: Increased public awareness and support for renewable energy Level of community awareness on renewable energy Limited knowledge on solar energy 50% of LGU staff and stakeholders educated 70% of LGU staff and stakeholders educated Survey reports Public Information Office Output 3.1: Conduct awareness campaigns and training sessions Number of awareness campaigns held No campaigns conducted At least 1 awareness campaign conducted At least 3 awareness campaigns conducted Event reports, attendance records Public Information Office Activity 3.1.1: Organize community outreach programs Number of outreach programs No existing programs 1 outreach session conducted At least 2 community outreach sessions Outreach reports Public Information Office Activity 3.1.2: Disseminate informational materials Number of materials distributed No available materials Brochures and posters distributed Expanded distribution including online content Distribution records Public Information Office Output 3.2: Stakeholder engagement and Inclusion of renewable energy policies No existing renewable energy policies Policy framework drafted Renewable energy policy integrated into Policy documents Planning Office
Project Results Indicator(s) Baseline term) Target (Final) Verification Data policy development in LGU plans LGU plans Activity 3.2.1: Conduct stakeholder consultations Number of consultations held No consultations conducted 1 consultation held At least 2 consultations held Consultation reports Planning Office Activity 3.2.2: Draft renewable energy policies for LGU Policy drafted and approved No existing policy Draft policy created LGU-approved renewable energy policy Policy document Sangguniang Bayan This logical framework ensures a structured approach to implementing the Solar-Powered Municipal Building: A Path to Energy Sustainability project, outlining clear objectives, measurable indicators, and verifiable sources of data for effective monitoring and evaluation.