Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Sample Costing for a 2 Storey Building, Schemes and Mind Maps of Mechanics of Materials

Sample Costing for a 5 Million Two-Storey Residential Building

Typology: Schemes and Mind Maps

2022/2023

Uploaded on 12/28/2023

harley-quinn-32
harley-quinn-32 🇵🇭

1 document

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
BILL OF QUANTITIES AND MANPOWER
A. FOUNDATION
S.N DESCRIPTION QUANTITY UNIT
RATE
TOTALAMOUNT
1SITECLEARING(STORE
HOUSE)
50,000
2EXCAVATIONAND
TRENCHES
100,000
3SANAGASAND 20TONS 180,000
4OTHERSAND(SABLE
CARRIERE)
20TONS 150,000
5GRAVEL5/15 10TONS 240,000
6GRAVEL15/25 10TONS
7TIMBERBOARD(planche) 60 3000 180,000
8Batten(latte) 50 1000 50,000
9Nails80(pointe80) 5PACKETS 3500 17,500
10 BLOCK20 1300 350 455,000
11 ROD10 35 4900 171,500
12 ROD8 8 3200 25,600
13 ROD6 10 1800 18,000
14 Fasteningwire(fild’attache) 10 1000 10,000
15 CEMENT42.5R 35 6000 210,000
16 WaterFACILITIES(BIG
BARREL)
50,000
17 SPADE(PELLE) 5 3500 17,500
18 Buildingstring(ficelle) 03 1000 3000
19 BUCKET 10 1000 10,000
20 WHEELBARROW(brouette) 2 23000 46,000
MATERIALCOST 2,03,000FCFA
MANPOWERCOST 700,000FCFA
TOTALOFFOUNDATION 2,700,000CFA
REMARK:Wetookintoconsiderationthefollowings:
Groundbeamreinforcement4HA10section20×20
Columnreinforcement4HA10+2HA8section15×30
Footingsection80×80 reinforcement6HA10×6HA10
pf2

Partial preview of the text

Download Sample Costing for a 2 Storey Building and more Schemes and Mind Maps Mechanics of Materials in PDF only on Docsity!

BILL OF QUANTITIES AND MANPOWER

A. FOUNDATION

S .N DESCRIPTION QUANTITY UNIT

RATE

TOTAL AMOUNT

1 SITE CLEARING (STORE

HOUSE)

2 EXCAVATION AND

TRENCHES

3 SANAGA SAND 20TONS 180,

4 OTHER SAND( SABLE

CARRIERE)

20TONS 150,

5 GRAVEL 5/15 10TONS 240 ,

6 GRAVEL 15 /25 10TONS

(^7) TIMBER BOARD(planche) 60 3000 180, (^8) Batten(latte) 50 1000 50, (^9) Nails 80 (pointe80) 5PACKETS 3500 17, (^10) BLOCK20 1300 350 455, (^11) ROD 10 35 4900 171, (^12) ROD8 8 3200 25, (^13) ROD6 10 1800 18, (^14) Fastening wire (fil d’attache) 10 1000 10, (^15) CEMENT 42.5R 35 6000 210, (^16) Water FACILITIES(BIG BARREL)

17 SPADE (PELLE) 5 3500 17,

(^18) Building string (ficelle) 03 1000 3000 (^19) BUCKET 10 1000 10, (^20) WHEELBARROW (brouette) 2 23000 46, MATERIAL COST 2,03 ,000 FCFA MANPOWER COST 700,000 FCFA TOTAL OF FOUNDATION 2,700,000 CFA

REMARK: We took into consideration the followings:

 Ground beam reinforcement 4HA10 section 20×

 Column reinforcement 4HA10+2HA8 section 15×

 Footing section 80×80 reinforcement 6HA10×6HA

B. ELEVATION GROUND FLOOR

S.N DESCRIPTION QUANTITY UNIT RATE TOTAL AMOUNT

1 BLOCK15 3000 250 750,

2 CEMENT42.5R 50 6000 300,

3 WATER FACILITIES 50,

4 TIMBER BOARD(15cm) 20 2500 50,

5 ROD^10 30 4900 147,

6 ROD8^30 3200 96,

7 ROD6^20 1800 36,

8 Fastening^ wire^ (fil^ d’attache)^10 1000 10 ,

9 Nails^80 (pointe80)^5 3500 17,

10 SAND^ SANAGA^20 TONS 180,

11 CLAMPS(Serrre-joint)^6 5000 30,

12 DECORATION^ PILLAR^6 30,000 180,

MATERIAL COST 1,736,500 CFA

MANPOWER COST 550,000 CFA

TOTAL OF BLOCK LAYING 2,346,000 CFA

C. DECKING WORK (SLAB)

S.N DESCRIPTION QUANTITY UNIT RATE TOTAL AMOUNT

1 Hollow bloc (hourdis)

2 TIMBER BOARD(15cm)

3 TIMBER BOARD

4 Batten(latte)

5 ROD^10

6 ROD

7 ROD

8 Fastening^ wire^ (fil^ d’attache)

9 Nails^80 (pointe80)^3

10 CONCRETE^ NAILS^80

11 POLES^300

MATERIAL COST

MANPOWER COST

TOTAL OF BLOCK LAYING