Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NBCPO FOR BPO BUILDING, Schemes and Mind Maps of Civil Engineering

Contents are minimum requirements

Typology: Schemes and Mind Maps

2022/2023

Uploaded on 12/05/2023

joefer-cuetara
joefer-cuetara 🇵🇭

1 document

1 / 1

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Type of Construction - TYPE V (SEC 401 pg. 49)
Designation of Fire Zones ( Section 507 pg. 52)
FIre Resistive Standards (Sec. 603 pg. 53)
OCCUPANCY CATEGORY: GROUP E, DIVISION E-2, ZONING CLASSIFICATION C-2
(Sec. 701 pg. 57)
Location on Property (FIREWALLS) - Sec.704 pg. 84-86
Allowable Floor Areas (TGFA, TLA, PSO) sec.705 pg. 86-89 & 116-117
BUILDING HEIGHT LIMIT: 6 storeys w/ 18 meters above highest grade (sec. 707 pg.
91)
PARKING SPACE (Pg. 99 )
RROW (Pg. 94 , 105, 109, 144, & 145)
Requirements for Other Group Occupancies (pg. 112 - 115)
ISA, MACA & TOSL (124, 161)
LOT Type ( pg. 127)
Ceiling Height (pg. 135)
Air Space Requirments ( pg. 135 - 137)
Easement (pg. 138)
Planting Strip (151-152)
Basement (162)
CANOPIES, DOORS, Exterior Exits for Balconies, Corridors, Stairways (pg. 170, 198,
199)
Walkway (pg. 173)
RAMPS and RUNWAYS (pg 182)
EXITS (pg. 196-198, 201, 202, 206)
Aisle (pg. 203, 204)
Signs (pg. 242-243)
Stairs (pg. 373)

Partial preview of the text

Download NBCPO FOR BPO BUILDING and more Schemes and Mind Maps Civil Engineering in PDF only on Docsity!

● Type of Construction - TYPE V (SEC 401 pg. 49) ● Designation of Fire Zones ( Section 507 pg. 52) ● FIre Resistive Standards (Sec. 603 pg. 53) ● OCCUPANCY CATEGORY: GROUP E, DIVISION E-2, ZONING CLASSIFICATION C- (Sec. 701 pg. 57) ● Location on Property (FIREWALLS) - Sec.704 pg. 84- ● Allowable Floor Areas (TGFA, TLA, PSO) sec.705 pg. 86-89 & 116- ● BUILDING HEIGHT LIMIT: 6 storeys w/ 18 meters above highest grade (sec. 707 pg.

● PARKING SPACE (Pg. 99 ) ● RROW (Pg. 94 , 105, 109, 144, & 145) ● Requirements for Other Group Occupancies (pg. 112 - 115) ● ISA, MACA & TOSL (124, 161) ● LOT Type ( pg. 127) ● Ceiling Height (pg. 135) ● Air Space Requirments ( pg. 135 - 137) ● Easement (pg. 138) ● Planting Strip (151-152) ● Basement (162) ● CANOPIES, DOORS, Exterior Exits for Balconies, Corridors, Stairways (pg. 170, 198,

● Walkway (pg. 173) ● RAMPS and RUNWAYS (pg 182) ● EXITS (pg. 196-198, 201, 202, 206) ● Aisle (pg. 203, 204) ● Signs (pg. 242-243) ● Stairs (pg. 373)