Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
articultural boook boook bookokokokok
Typology: Essays (university)
1 / 13
This page cannot be seen from the preview
Don't miss anything!
MINISTRY ENERGY AND MINERAL RESOURCES DIRECTORATE GENERAL OF ELECTRICITY Jakarta, 29 Agustus 2012
Jarman Director General of Electricity presented at: Asia Pasific Ministers and Regional Governors Conference (APM-RGC) and Indonesia International Infrastructure Conference & Exibition (IIICE) 2012
The development of Economic Corridors requires a large amount of power supply. Under MP 3 EI, the additional power supply needed in Indonesia is projected to reach about 90 , 000 MW by the year 2025.
1. Sumatera EC: “Center for Production and Processing of Natural Resources and As Nation’s Energy Reserves” 2. Java EC: “Driver for National Industries and Services Provision” 3. Kalimantan EC : “Center for Production and Processing of National Mining and Energy Reserves” 4. Sulawesi EC: “Center for Production and Processing of National Agricultural, Plantation, Fishery, Oil & Gas, and Mining” 5. Bali – Nusa Tenggara EC: “Gateway for Tourism and National Food Support” 6. Papua – Kepulauan Maluku EC :“Center for Development of Food, Fisheries, Energy, and National Mining”
EC: Economic Corridor
(Based on RUKN 2010-2029)
RUKN: National General Electricity Planning
: Existing transmission line : Planning transmission line : Power generation
Based on PLN’s Electricity Business Plan (RUPTL PLN) 2011 - 2020 , stated that the electricity demand growth is projected about 8. 46 % per year. In order to fulfill the demand growth and to support the MP 3 EI program, the additional capacity of power generation that will be developed up to year 2020 is about 55 , 345 MW or 5 , 535 MW per year in average. 4,777 4, 18, 9, 20,332 19, 47, 38, 2012 2020 1,161 1, 3, 2, 2012 2020 2012 2020 1,340 1, 4, 2, 2012 2020 332 331 2, 767 2012 2020 133 105 591 (^273184) 156 (^563533) (^2012 2020 2012 ) Source: RUPTL PLN 201 1 - 2020 and PLN Statistics 2011 LEGEND: : Rated Capacity (MW) : Peak Load (MW) : Electricity Consumption 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap 14.6% 76.5% 3.7% 3.6% 0.8% 0.3% 0.5% Sum JB Kal Sul Nusra Mal Pap
(in kms) Up to year 2020 , the total transmission line that will be developed about 49 , 299 kms, consists of 500 kV dan 150 kV line for Java-Bali system and 500 kV, 275 kV, 150 kV, dan 70 kV line for outside Java- Bali system. Up to year 2020 , the total distribution line that will be developed about 416 , 906 kms. Development of distribution line is aimed to maintain the realibility of the system and accomodate the additional of new customers. Transmission Distribution Transmission Distribution Source: RUPTL PLN 201 1 - 2020 Transmission Distribution Transmission Distribution Transmission Distribution Transmission Distribution Transmission Distribution 9, 28, 2012 2020 21, 40, 2012 2020 1, 9, 2012 2020 3, 9, 2012 2020 2, 2012 2020 1, 2012 2020 918 2012 2020 167, 268, 2012 2020 381, 555, 2012 2020 47, 151, 2012 2020 52, 80, 2012 2020 16,830^ 22, 2012 2020 7, 11, 2012 2020 6,355^ 10, 2012 2020
2008 2009 2010 2011 2012 2013 2014 2015 Oil (^) 36% 25% 22% 23.0% 13.8% 9.7% 7.2% 5.5% Bio Diesel & other Renewable Energy 0% 0% 0% 0.1% 0.5% 0.5% 0.5% 0.5% Hydro 9% 8% 12% 6.8% 6.3% 6.2% 5.8% 5.3% Geothermal 3% 3% 3% 5.1% 4.8% 4.8% 4.5% 5.3% Gas 17% 25% 25% 21.0% 23.2% 22.1% 24.5% 24.0% Coal (^) 35% 39% 38% 44.1% 51.4% 56.7% 57.6% 58.8% 0% 20% 40% 60% 80% 100%
Power Generation To finalize the construction of Fast Track Program 10. 000 MW Phase I and Phase II To finalize the construction of power generation project owned by PLN and IPP in regular program To finalize development of GeoPP and HEPP in an effort to utilize new and renewable energy and local energy. To encourage the development of Pump Storage HEPP to minimize utilization of oil during the peak load in Java-Bali system. To encourage the development of Mine Mouth CFPP in an effort to utilize the potential of Low Rank Coal and CFPP with Ultra Super Critical technology to reduce emmision. To accelerate gas allocation and supply for power generation in an effort to reduce oil cunsumption. Transmission Line To finalize development of transmission line related to Fast Track Program 10. 000 MW Phase I and Phase II To solve de-bottlenecking of transmission line especially in Java-Bali and Sumatera system To develop Java-Sumatera interconnection system in order to transfer power from a large Mine Mouth CFPP in Sumatera to Java. To develop interconnection system in Kalimantan and Sulawesi To develop West Kalimantan-Serawak interconnection system in order to fulfill the demand and to reduce the oil utilization. To develop Sumatera-Malaysia Peninsula interconnection system in order to optimize the power system operation. To Accelerate The Electrification Ratio Level