




























































































Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
civil engineering document for practical
Typology: Cheat Sheet
1 / 547
This page cannot be seen from the preview
Don't miss anything!
REKAPITULASI DAFTAR KUANTITAS DAN HARGA
1 PEMELIHARAAN RUTIN KONDISI 1,680,088,305.
(^2) PENUNJANGAN/HOLDING 3,363,729,679.
3 PENANGANAN LONGSORAN 8,064,318,419.
(^4) PEMELIHARAAN BERKALA JEMBATAN 206,744,842.
5 REHABILITASI JEMBATAN 1,967,400,062.
(^6) PENANGANAN DRAINASE 1,827,787,173.
Terbilang : Tujuh Belas Miliar Seratus Sepuluh Juta Enam Puluh Delapan Ribu Rupiah
Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN
Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah) a b c d e f q r q r t u t u h i d v (^) HPS
DIVISI 1. UMUM 1.2 Mobilisasi 1.2 Mobilisasi LS 180,110,000.00 - - - - - 1.00 180,110,000.00 1.00 180,110,000.00 ###
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 22,197.49 - - - - - 2,840.83 63,059,295.52 2,840.83 63,059,295.52 ### 2.2.(1) Pasangan Batu dengan Mortar 516,130.75 - - - - - 1,198.26 618,458,830.13 1,198.26 618,458,830.13 ### 2.3.18 Gorong - Gorong Kotak Beton Bertulang, Ukuran dalam 150 cm x 150 cm 5,710,361.56 - - - - - 13.00 74,234,700.23 13.00 74,234,700.23 ### 2.3.(28) Saluran berbentuk U Tipe DS 4 832,926.66 - - 430.00 358,158,465.42 - - - 430.00 358,158,465. 2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) 254,518.78 - - 170.65 43,433,629.91 - - - 170.65 43,433,629.
3.1.(1) Galian Biasa 22,515.39 - - 1,024.69 23,071,294.98 5.44 122,483.72 1,798.75 40,499,557.76 68.25 1,536,675.37 2,897.13 65,230,011.83 ### 3.1.4 Galian Struktur dengan kedalaman 0 - 2 meter 69,421.55 - - - - - 29.25 2,030,580.34 29.25 2,030,580.34 ### 3.1.7 Galian Perkerasan Beraspal dengan Cold Milling Machine 247,202.98 - - - 10.87 2,687,096.43 60.76 15,020,053.28 - 71.63 17,707,149.71 ### 3.1.8 Galian Perkerasan Beraspal tanpa Cold Milling Machine 227,958.41 - 118.75 27,070,061.17 - - - 1.20 273,550.09 119.95 27,343,611.26 ### 3.1.9 Galian Perkerasan berbutir 42,484.80 - - - - - 48.00 2,039,270.16 48.00 2,039,270.16 ### 3.2.(1a) Timbunan Biasa dari Sumber Galian 160,147.66 - - - - 1,260.00 201,786,051.60 6.50 1,040,959.79 1,266.50 202,827,011.39 ### 3.2.(2a) Timbunan Pilihan dari Sumber Galian 284,475.95 - - 70.62 20,089,691.59 - - 56.45 16,058,667.38 127.07 36,148,358. 3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) 264,979.44 - - 12.10 3,206,251.26 - - - 12.10 3,206,251.
Total Volume
Total Harga
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga Volume Jumlah Harga (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah) (Rupiah)
Total Volume
Total Harga
5.1.(1) Lapis Pondasi Agregat Kelas A 393,162.56 - - 5,107.54 2,008,093,478.56 20.44 8,036,242.63 48.75 19,166,674.58 72.00 28,307,703.99 5,248.73 2,063,604,099.76 ###
6.1.(1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 11,149.34 - - 100.63 1,121,957.64 - - 312.00 3,478,592.69 412.63 4,600,550.33 ### 6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 10,919.26 - 2,375.00 25,933,242.50 281.75 3,076,501.51 95.06 1,037,984.86 274.33 2,995,480.60 36.00 393,093.36 3,062.14 33,436,302.82 ### 6.3.5a Laston Lapis Aus (AC-WC) Ton 1,071,080.51 - 275.50 295,082,681.42 96.28 103,123,631.82 25.20 26,991,228.94 72.74 77,910,396.54 22.27 23,855,105.19 491.99 526,963,043.91 ### 6.3.6a Laston Lapis Antara (AC-BC) Ton 1,053,435.82 - - 101.50 106,923,735.62 - 19.49 20,531,464.11 33.41 35,195,290.71 154.40 162,650,490. 6.3.(8) Bahan anti pengelupasan Kg 55,000.00 - - - 4.62 254,100.00 19.53 1,074,150.00 10.19 560,450.00 34.34 1,888,700.
7.1(5a) 1,916,988.45 - - 407.44 781,057,773.85 - 20.00 38,339,768.99 103.42 198,254,945.44 530.86 1,017,652,488. 7.1(7)a Beton struktur, Fc' 20 Mpa 1,130,130.27 - - 160.57 181,465,017.35 20.44 23,099,862.71 30.00 33,903,908.08 10.68 12,069,791.28 221.69 250,538,579.41 ### 7.1(10) Beton, Fc'10 Mpa 829,453.58 - - 4.67 3,873,548.21 - - 2.41 1,998,983.13 7.08 5,872,531.34 ### 7.3 (1) Baja Tulangan Polos - BjTP 280 Kg 14,502.40 - - 9,842.50 142,739,872.00 - - 6,423.20 93,151,815.68 16,265.70 235,891,687. 7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 14,502.40 - - 46,077.61 668,235,931.26 - - - 46,077.61 668,235,931.26 ### 7.3 (3) Baja Tulangan Sirip - BjTS 420A Kg 15,451.70 - - - - 1,442.31 22,286,141.43 - 1,442.31 22,286,141.43 ### 7.6 (1) (^) Fondasi Cerucuk, Pengadaan dan Pemancangan Cerucuk 71,342.86 - - - - - 198.00 14,125,885.71 198.00 14,125,885.71 ### 7.6.19b (^) Tiang Bor Beton diameter 300 mm 929,017.32 - - 1,515.00 1,407,461,239.18 - - - 1,515.00 1,407,461,239. 7.9.(1) (^) Pasangan Batu 617,876.58 - - 2,086.47 1,289,180,956.47 103.24 63,789,578.54 1,143.96 706,826,097.17 19.10 11,801,442.76 3,352.77 2,071,598,074.95 ### 7.15 (1) (^) Pembongkaran Pasangan Batu 104,423.71 - - - 3.05 318,492.32 8.50 887,601.55 - 11.55 1,206,093.87 ### 7.15 (2) (^) Pembongkaran Beton 399,485.67 - - - - 8.00 3,195,885.38 1.80 719,074.21 9.80 3,914,959.59 ###
8.2.1 Penambahan (Patching) M3 3,815,523.31 - - - - 24.60 93,861,873.43 - 24.60 93,861,873.43 ### 8.2.2 (^) Perbaikan dengan cara Graut M3 20,997,900.00 - - - - 12.50 262,473,750.00 - 12.50 262,473,750.00 ### 8.4.4 (^) Perkuatan struktur dengan bahan FRP jenis carbon per lapis pada daerah kering 1,986,344.43 - (^) - - - 88.00 174,798,310.08 - (^) 88.00 174,798,310. 8.5.6a Pengencangan Baut Biasa Grade A diameter M25 Buah 42,648.57 - - - 185.00 7,889,985.71 - - 185.00 7,889,985.71 ### 8.7.1a Pengecatan struktur baja pada daerah kering tebal 80 mikron 52,077.14 - - - 352.88 18,376,982.17 - - 352.88 18,376,982.17 ### 8.11.1 Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug 1,363,541.67 - - - 14.00 19,089,583.33 29.60 40,360,833.33 - 43.60 59,450,416.67 ### 8.13.2 Perbaikan Sandaran Beton-Baja 629,200.00 - - - 6.00 3,775,200.00 - - 6.00 3,775,200.
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Beton Struktur fc’=30 Mpa M^3 M^3 M^3
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
REKAPITULASI DAFTAR KUANTITAS DAN HARGA PEMELIHARAAN RUTIN KONDISI
BOQ Page 8 of 547
Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 26.41 Km Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN
No. Mata Uraian Satuan Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)
10.1.1 Galian pada Saluran Air atau Lereng untuk pemeliharaan M3 264.00 57,288.80 15,124,243. 10.1.3 Perbaikan Pasangan batu dengan Mortar M3 118.80 516,130.75 61,316,333. 10.1.6 Perbaikan Lapis Pondasi Agregat Kelas S M3 246.00 459,370.18 113,005,064. 10.1.9 Perbaikan Campuran Aspal Panas M3 520.00 2,153,715.19 1,119,931,899. 10.1.16 Perbaikan Pasangan Batu M2 209.00 247,150.63 51,654,482. 10.1.21 Pembersihan Drainase M 13,205.00 4,024.22 53,139,820. 10.1.22 Pengendalian Tanaman M2 78,791.30 1,436.47 113,181,161.
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,527,353,004.
BOQ Page 10 of 547
Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 23.85 Km Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN
No. Mata Uraian Satuan Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)
3.1.8 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 118.75 227,958.41 27,070,061.
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 27,070,061.
6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 2,375.00 10,919.26 25,933,242. 6.3.5a Laston Lapis Aus (AC-WC) Ton 275.50 1,071,080.51 295,082,681.
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 321,015,923.
10.1.3 Perbaikan Pasangan batu dengan Mortar M3 264.60 516,130.75 136,568,196. 10.1.6 Perbaikan Lapis Pondasi Agregat Kelas S M3 357.00 459,370.18 163,995,154. 10.1.9 Perbaikan Campuran Aspal Panas M3 1,095.00 2,153,715.19 2,358,318,133. 10.1.16 Perbaikan Pasangan Batu M2 99.84 247,150.63 24,675,519. 10.1.18 Perbaikan Rel Pengaman Buah 150.00 148,502.27 22,275,340. 10.1.19 Pembersihan Patok Buah 239.00 11,393.20 2,722,975. 10.1.20 Pembersihan Rambu Buah 119.00 10,880.40 1,294,767.
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 2,709,850,087.
REKAPITULASI DAFTAR KUANTITAS DAN HARGA PENANGANAN LONGSORAN
REKAPITULASI DAFTAR KUANTITAS DAN HARGA PEMELIHARAAN BERKALA JEMBATAN
REKAPITULASI DAFTAR KUANTITAS DAN HARGA REHABILITASI JEMBATAN
BOQ Page 17 of 547
DAFTAR KUANTITAS DAN HARGA REHABILITASI JEMBATAN Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 37 m Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN
No. Mata Uraian^ Satuan^ Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)
3.1.(1) Galian Biasa M3 1,798.75 22,515.39 40,499,557. 3.1.7 Galian Perkerasan Beraspal dengan Cold Milling Machine M3 60.76 247,202.98 15,020,053. 3.2.(1a) Timbunan Biasa dari Sumber Galian M3 1,260.00 160,147.66 201,786,051.
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 257,305,662.
5.1.(1) Lapis Pondasi Agregat Kelas A M3 48.75 393,162.56 19,166,674.
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 19,166,674.
6.1.(2a) Lapis Perekat - Aspal Cair/Emulsi Liter 274.33 10,919.26 2,995,480. 6.3.5a Laston Lapis Aus (AC-WC) Ton 72.74 1,071,080.51 77,910,396. 6.3.6a Laston Lapis Antara (AC-BC) Ton 19.49 1,053,435.82 20,531,464. 6.3.(8) Bahan anti pengelupasan Kg 19.53 55,000.00 1,074,150.
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 102,511,491.
7.1(5a) Beton Struktur fc’=30 Mpa M3 20.00 1,916,988.45 38,339,768. 7.1(7)a Beton struktur, Fc' 20 Mpa M3 30.00 1,130,130.27 33,903,908. 7.3 (3) Baja Tulangan Sirip - BjTS 420A Kg 1,442.31 15,451.70 22,286,141. 7.9.(1) Pasangan Batu M3 1,143.96 617,876.58 706,826,097. 7.15 (1) Pembongkaran Pasangan Batu M3 8.50 104,423.71 887,601. 7.15 (2) Pembongkaran Beton M3 8.00 399,485.67 3,195,885.
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 805,439,402.60 0
REKAPITULASI DAFTAR KUANTITAS DAN HARGA PENANGANAN DRAINASE
BOQ Page 20 of 547
DAFTAR KUANTITAS DAN HARGA PENANGANAN DRAINASE Nama Paket : PRESERVASI JALAN PROBOLINGGO - LUMAJANG - TUREN PPK : 1.5 PROVINSI JAWA JAWA TIMUR Panjang Jalan : 3.15 Km Prop/Kab/Kodya : PROVINSI JAWA TIMUR Ruas Jalan : PROBOLINGGO - LUMAJANG - TUREN
No. Mata Uraian^ Satuan^ Perkiraan Harga Jumlah Pembayaran Kuantitas Satuan Harga-Harga (Rupiah) (Rupiah) a b c d e f = (d x e)
1.2 Mobilisasi 1.2 Mobilisasi LS 1.00 180,110,000.00 180,110,000.
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 63,900,000.00 63,900,000.
1.17 Pengamanan Lingkungan Hidup LS - - 1.17.(1a) Pengujian pH Buah 3.00 300,000.00 900,000. 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 3.00 300,000.00 900,000. 1.17.(2c) Pengajuan Parameter Kebisingan dan/atau Getaran Lainya Buah 3.00 3,000,000.00 9,000,000. 1.17.(3h) Pengujian Parameter Udara dan Ambien lainya Buah 3.00 3,000,000.00 9,000,000.
1.19 Kesehatan dan Keselamatan Kerja 1.19 Kesehatan dan Keselamatan Kerja LS 1.00 108,170,000.00 108,170,000.
1.21 Manajemen Mutu 1.21 Manajemen Mutu LS 1.00 87,000,000.00 87,000,000.
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 458,980,000.
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 2,840.83 22,197.49 63,059,295. 2.2.(1) Pasangan Batu dengan Mortar M3 1,198.26 516,130.75 618,458,830. 2.3.15 Gorong - Gorong Kotak Beton Bertulang, Ukuran dalam 150 cm x 150 cm M1 13.00 5,710,361.56 74,234,700.
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 755,752,825.
3.1.(1) Galian Biasa M3 68.25 22,515.39 1,536,675. 3.1.4 Galian Struktur dengan kedalaman 0 - 2 meter M3 29.25 69,421.55 2,030,580. 3.1.8 Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 1.20 227,958.41 273,550. 3.1.9 Galian Perkerasan berbutir M3 48.00 42,484.80 2,039,270. 3.2.(1a) Timbunan Biasa dari Sumber Galian M3 6.50 160,147.66 1,040,959. 3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 56.45 284,475.95 16,058,667.
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 22,979,703.
5.1.(1) Lapis Pondasi Agregat Kelas A M3 72.00 393,162.56 28,307,703.
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 28,307,703.