BHEL summer training report, Summaries of Mineralogy and Mineral Processing

Training report of BHEL haridwar summer training

Typology: Summaries

2020/2021

Uploaded on 03/12/2022

abhi-sharma-10
abhi-sharma-10 🇮🇳

1 document

1 / 16

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
PLANT LOCATION OF BHEL
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff

Partial preview of the text

Download BHEL summer training report and more Summaries Mineralogy and Mineral Processing in PDF only on Docsity!

PLANT LOCATION OF BHEL

BHEL HARIDWAR

  • (^) BHEL Haridwar is situated in Ranipur at the backup of Shivalik Hills, near about 10 km east towards haridwar in Uttrakhand. It is basically divided into two plants.
  • (^) My area of training was Steel Melting Shop in CFFP plant.

BHEL^ BHEL

HEEP^ HEEP^ CFFPCFFP

CENTRAL FOUNDRY FORGE

PLANT

  • (^) Central Foundry Forge Plant commonly said as CFFP.
  • (^) It was setup in 1976 to manufacture highly sophisticated steel castings and forgings for fulfilling requirements in all BHEL units.
  • (^) The initial design was to manufacture casting and forgings for 210 MW Russian design thermal sets.
  • (^) CFFP has one of the heavies forge machines in India.

VISITED DEPARTMENTS OF CFFP

  • (^) Forge Shop
  • (^) Steel Melting Shop
  • (^) Steel Foundry
  • (^) Machine Shop
  • (^) Pattern Shop

ABOUT SMS

  • (^) In April 1976 Steel Melting Shop was the first shop to go on stream of melting. The first melt was taken from electric arc furnace of 10 T.
  • (^) Now steel melting shop of BHEL Haridwar has 3 EAF (Electric Arc Furnace) of different tonnage capacity.  (^) 10 T

 (^) 20 T

 (^) 70 T

  • (^) Today with its current facilities SMS is capable of making steel ingots of various sizes and weight.

PROCESS OCCURING IN SMS

SCRAP BAY^ SCRAP BAY
FURNACE BAY^ FURNACE BAY
PIT SIDE^ PIT SIDE
SERVICES
DEPARTMENT
SERVICES
DEPARTMENT
SECONDARY
REFINING
SECONDARY
REFINING

CHARGE PREPARATION

  • (^) The weight of charge is 1.14 times the liquid metal requirement.
  • (^) The charge consist of –

 (^) Heavy return scrap= 34%

 (^) Universal scrap= 60%

 (^) Graphite powder or broken electrode pieces= 6.4- 6.7%

FURNACE PREPARATION

  • (^) Scrap of required grade is melted in direct EAF with basic melting practices.
  • (^) Furnace lining consists of magnesite bricks.
  • (^) Roof ring of furnace tightly fitted with super duty alumina brick.

POURING

Sand bed formation (^) During pouring Just after pouring

Final product without removal of riser and runner After pouring

LOAD CELL

MACHINE SHOP