










Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
alternative construction system
Typology: Summaries
1 / 18
This page cannot be seen from the preview
Don't miss anything!
Prepared by: Ar. REYNALDO C. VENTURA, JR. MSCM, UAP, Int’l Assoc. AIA, PEM, ACP
3 Units
5 Hours / Week
Group Dynamics
Discuss:
Group 1 Cast-In-Place and Pre-cast
Group 4 Composite Construction Method
Group 5 Pre-Engineered Materials & Structures
Group 6 Wall Construction
Group 7 Skylight Construction
Group 10 Shell Structures
Part 1 - PROJECT DESIGN DEVELOPMENT
(Perspective, Site Development, Table Of Contents, Information of the Project, Area Calculation), PLANS (Partition, RCPs, Finishes, Furniture, Power & Communication), ELEVATIONS, SECTIONS, WALL/BAY SECTIONS, ENLARGED PLANS & DETAILS, TYPICAL DETAILS, SCHEDULES (Doors & Windows, Finishes, FFE)
SYSMBOLS (Column Grid, Tags, Dimensions, Cross reference, etc.)
Title : PROPOSED 3 STOREY, 4 BEDROOM RES. Façade Design: MODERN and/or CONTEMPORARY Space Requirements: 3 CARS GARAGE, LIVING, DINING, KITCHEN, SERVICE KITCHEN, MASTER’S BEDROOM, BEDROOMS, GUEST ROOM, FAMILY AREA, LIBRARY/STUDY ROOM, MINI GYM, TERRACE, LANAI, TOILET & BATH, FATHER’S HOBBY AREA, MAIDS QUARTER
JUL 20 Ø GROUP 3 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) JUL 27 Ø GROUP 4 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) AUG 03 Ø GROUP 5 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) AUG 10 Ø STUDIO WORKS (INDIVIDUAL PROJECT)
ST
AUG 17 Ø SUBMISSION OF INDIVIDUAL WORK - PART 1 AUG 24 Ø MID-TERM EXAM AUG 31 Ø GROUP 6 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) SEP 07 Ø GROUP 7 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT)
ST
SEP 14 Ø GROUP 8 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) SEP 21 Ø GROUP 9 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) SEP 28 Ø GROUP 10 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) OCT 05 Ø STUDIO WORKS (INDIVIDUAL PROJECT)
ST
OCT 12 Ø SUBMISSION OF INDIVIDUAL WORK – PART 2 OCT 19 Ø FINAL EXAMINATION
ST