alternative construction system, Summaries of Construction Procedures

alternative construction system

Typology: Summaries

2023/2024

Uploaded on 10/01/2024

doctors-dorong
doctors-dorong 🇵🇭

1 document

1 / 18

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
6/29/18
1
BUILDING.TECHNOLOGY.5.(BT-5)
ALTERNATIVE)BUILDING)
CONSTRUCTION)SYSTEM
Prepared.by :
Ar.)REYNALDO)C.)VENTURA,)JR.
MSCM,.UAP,.Int’l.Assoc..AIA,.PEM ,.ACP
BT5)Alternative)Building)
Construction)System
Construction.methods.and.techniques.
for.different.types.of.buildings.using.
any.appropriate.alternative.building.
construction.system.
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12

Partial preview of the text

Download alternative construction system and more Summaries Construction Procedures in PDF only on Docsity!

BUILDING TECHNOLOGY 5 (BT-5)

ALTERNATIVE BUILDING

CONSTRUCTION SYSTEM

Prepared by: Ar. REYNALDO C. VENTURA, JR. MSCM, UAP, Int’l Assoc. AIA, PEM, ACP

BT5 – Alternative Building

Construction System

Construction methods and techniques

for different types of buildings using

any appropriate alternative building

construction system.

Number of Units

3 Units

Number of

Meeting Hours

5 Hours / Week

Project Design Stages

  • Concept/ Schematic
  • Design Development
  • Construction Documents
  • Construction

Group Dynamics

Group Report Presentation Guide

Discuss:

  • INTRODUCTION & DEFINITION
  • ADVANTAGES & DIS-ADVANTAGES
  • DETAILS
  • SAMPLE IMAGE
  • VIDEO PRESENTATION (IF POSSIBLE)

Group Report Slide Guide

Should be:

  • WHITE BACKGROUND
  • 4:3 (STANDARD) PAGE RATIO
  • MINIMUM FONTS SIZES IS 30 PT.
  • FONT STYLE TO USE = ARIAL, TIMES

ROMAN, CALIBRI OR HELVETICA

Group Reporting Topic

Group 1 Cast-In-Place and Pre-cast

  • Floor System and Roof Slab System Ø Flat Slab Ø Flat Plate Ø Ribbed Floor Slab Ø Waffle Slab Ø Lift Slab Ø Spanstress Floor System Ø Slipform Method

Group Reporting Topic

Group 4 Composite Construction Method

  • Light Frame
  • Composite Deck/Slab
  • Composite Column
  • Shear Connections
  • Cambering

Group Reporting Topic

Group 5 Pre-Engineered Materials & Structures

  • Engineered Wood
  • Wood Composite & Building Boards
  • Engineered Steel Construction
  • Other Structure (example: Pre-engineered Green house, Toilets, etc.)

Group Reporting Topic

Group 6 Wall Construction

  • Curtain Walls
  • Window Wall
  • Metal Cladding
  • Tilt-Up Construction
  • Materials
  • Stick System
  • Ladder System
  • Unitized System
  • Rainscreen System

Group Reporting Topic

Group 7 Skylight Construction

  • Skylight for Light
  • Skylight for View
  • Skylight for Ventilation
  • Sizes Consideration
  • Styles
  • Materials

Group Reporting Topic

Group 10 Shell Structures

  • Concrete Shell
  • Gridshell
  • Thin-Shell
  • Monocoque Shell
  • Steel Framing

Individual Work

Presentation

Individual Work Project

Part 1 - PROJECT DESIGN DEVELOPMENT

  • DIFFERENT VIEWS (MINIMUM 4 RENDERED VIEWS; 2 EXTERIOR & 2 INTERIOR )
  • FLOOR PLANS (WITH FURNITURE, FIXTURE & EQUIPMENT LAYOUT)
  • ELEVATIONS & SECTIONS
  • MATERIALS SCHEDULE WITH IMAGE AND INSTALLATION DETAILS Design Development Submission Guide
  • DOCUMENT SIZE/S = A3 OR 11”X17”
  • SHOULD BE BINDED (COVER CODE = BLUE)
  • INFORMATION PAGE
  • ALL DRAWINGS SHOULD BE RENDERED
  • MATERIAL SCHEDULES SHOULD INCLUDE SUPPLIER OR MANUFACTURER CONTACT INFORMATION
  • MATERIALS SHOULD BE SCANNED OR PICTURED AND INCLUDE IN THE BINDED SET.

Individual Work Project

Construction Document Submission Guide

– SUBMISSION SIZES = AS PER BUILDING CODE

– SHOULD BE BINDED

– DRAWING/S INCLUDES: COVER PAGE

(Perspective, Site Development, Table Of Contents, Information of the Project, Area Calculation), PLANS (Partition, RCPs, Finishes, Furniture, Power & Communication), ELEVATIONS, SECTIONS, WALL/BAY SECTIONS, ENLARGED PLANS & DETAILS, TYPICAL DETAILS, SCHEDULES (Doors & Windows, Finishes, FFE)

Individual Work Project

Construction Document Submission Guide

– ALL DRAWING/S SHOULD HAVE: DRAFTING

SYSMBOLS (Column Grid, Tags, Dimensions, Cross reference, etc.)

  • DOCUMENT/S INCLUDES: PROBABLE CONSTRUCTION COST (ESTIMATE) & MATERIAL SPECIFICATIONS
  • DOCUMENT/S CAN BE SUBMITTED IN A4 OR LETTER SIZE PAPER

Individual Work Project

Construction Document

Example Submission

Title : PROPOSED 3 STOREY, 4 BEDROOM RES. Façade Design: MODERN and/or CONTEMPORARY Space Requirements: 3 CARS GARAGE, LIVING, DINING, KITCHEN, SERVICE KITCHEN, MASTER’S BEDROOM, BEDROOMS, GUEST ROOM, FAMILY AREA, LIBRARY/STUDY ROOM, MINI GYM, TERRACE, LANAI, TOILET & BATH, FATHER’S HOBBY AREA, MAIDS QUARTER

Individual Work Project

JUL 20 Ø GROUP 3 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) JUL 27 Ø GROUP 4 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) AUG 03 Ø GROUP 5 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) AUG 10 Ø STUDIO WORKS (INDIVIDUAL PROJECT)

BT5 SCHEDULE (FY2018-19, 1

ST

SEM)

AUG 17 Ø SUBMISSION OF INDIVIDUAL WORK - PART 1 AUG 24 Ø MID-TERM EXAM AUG 31 Ø GROUP 6 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) SEP 07 Ø GROUP 7 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT)

BT5 SCHEDULE (FY2018-19, 1

ST

SEM)

SEP 14 Ø GROUP 8 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) SEP 21 Ø GROUP 9 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) SEP 28 Ø GROUP 10 REPORTING Ø STUDIO WORKS (INDIVIDUAL PROJECT) OCT 05 Ø STUDIO WORKS (INDIVIDUAL PROJECT)

BT5 SCHEDULE (FY2018-19, 1

ST

SEM)

OCT 12 Ø SUBMISSION OF INDIVIDUAL WORK – PART 2 OCT 19 Ø FINAL EXAMINATION

BT5 SCHEDULE (FY2018-19, 1

ST

SEM)